Water treatment and cooling plant for a new Melt shop for Wire Rod Mill and for Bar Mill for Balboa Steel
Espana – Jerez de los CaballerosDeclared production – 2.500.000 TPY
Capacity:
INDIRECT CIRCUITS 9.175 m³/h
DIRECT CIRCUITS 1.950 m³/h
RUNOUT CIRCUITS 1.500 m³/h
MAKE-UP SAND FILTERED WATER 250 m³/h
Process:
MACHINE CLOSED CIRCUITS:
- Cooling by Plate Exchangers
- Secondary Cooling by towers
- Sand Filtration
- Chemicals Dosing
- Emergency System
OPEN CIRCUITS FURNACE + RM:
- Cooling Towers
- Sand Filtration
- Chemicals Dosing
- Emergency System
RM MOTORS CLOSED CIRCUITS:
- Cooling Towers
- Chemicals Dosing
- Emergency System
CCM WIRE ROD RM SECTION RM:
- Scale Pit
- Settling & Deoling
- Sand Filtration
- Cooling by Plate Exchangers
- Chemicals Dosing
- Sludge Treatment
RUNOUT CIRCUITS:
- Make-up water plant